GENNEIA Authorities, Along With Officials from Puerto Madryn, Attend the landing and transfer of various components of the wind turbines will be installed in the Rawson Wind Farm. Is 33 tower sections, nacelle November 70 tons each, Which Housed the generator That Converts wind energy into electricity 11 bushings 20 tons -component mill in Which Palas- and 11 are assembled games blades with a length of 45 meters and almost 8 tons each. As in the previous study Happened, the materials will be Transported to the PER in special and under strict road safety Measures carts.