11
38
151,000

Genneia made a partnership with the company Centrales de la Costa for the development of this project, adjudicated in round 1.5 RenovAr. The Farm started to operate in February 2020.

For its construction, it was acquired a financing of US$ 51 million, under Project Finance framework granted by the bank of development FMO (Holland), with the guarantee of the official agency of credit for exportation EKF ( Denmark).

EXCELLENCE INDICATOR

The load factor of Vientos de Necochea Wind Farm is among the highest in the world:

47.6% capacity factor 

KNOW MORE

The load factor is the relation between the energy effectively generated by a farm along a period of time and the maximum it would be possible to produce, in ideal conditions, along the same period of time. It is about not only the quality of wind but also the good performance and availability of the technology in the farm thanks to the best practices of operation and maintenance.

Latest news

Multimedia

More information

Useful data

Location

Avda. 10 y Calle 225 N°7630 – Necochea (Buenos Aires)

Non-technical summary

  Download