17
51
150,000

Genneia acquired Trelew Wind Farm in 2017, which came out four years before within the programme GENREN. Trelew it´s the company’s first wind farm in which, since 2020, Genneia’s argentine technicians take care of the full maintenance.

Its GE ECO 100 turbines are amazing with their 75 meters height and a rotor of 100 metres diameter to neighbours and tourists who go by route 3, in the way between Trelew and Puerto Madryn.

EXCELLENCE INDICATOR

Trelew Wind Farm has a load factor almost 15 points over the world average.

Wind Farm Trelew: 42.6%


KNOW MORE

The load factor is the relation between the energy effectively generated by a farm along a period of time and the maximum it would be possible to produce in ideal conditions, along the same period of time. It is about not only the quality of wind but also the good performance and availability of the technology in the farm thanks to the best practices of operation and maintenance.

Latest news

Multimedia

More information

Useful data

Location

Ruta Nac. N °3, Km 1440 - Trelew (Chubut)

Non-technical summary

  Download