The 11 wind turbines of Vientos de Necochea Wind Farm already produce energy for more than 52 thousand households
_____
The long-awaited day arrived, and it was a Saturday, because the generation knows no rest: with the permission of CAMMESA, Vientos de Necochea (38 MW), the seventh wind farm Genneia and its second renewable center in Buenos Aires area, began to provide clean energy for the consumption of thousands of Argentines. Speaking with numbers, 158,000 MW per year, equivalent to the consumption of 52,000 households.
Located in the Punta Negra, 15 km to the south of the city of Necochea, the park is owned by Genneia and Central Atlantic Coast. For construction and commissioning he was signed a financing agreement for $ 51 million with the development bank FMO Dutch and has EKF guarantee, the credit bureau to Danish export. The credit is Project Finance for a period of 15 years which means that their repayment was backed solely by the cash flow generated by the park from now on.
Its 11 turbines Vestas technology and 83 meters high rotor prevent the emission of 79,000 tons of CO2 into the atmosphere, as well as magnify the spectacle of the necochenses beaches.
With the commissioning of Vientos de Necochea, our company accumulates an output of 600 MW and 700 MW of renewable energy (solar + wind), confirming its position as the leading renewable energy company in Argentina. 2020 bet to expand the operational capacity with the construction of wind farms Chubut Norte III (57 MW) and Chubut Norte IV (83 MW) together with PAE; and Chubut Norte II (26 MW) project destined for the Term Market Renewable Energy, bound for private clients.